Pictorial Diary
 

Weeks 1-2,   July - Contractor Mobilisation and On Site

dean.jpg (3490 bytes) clearance.jpg (3493 bytes) safty.jpg (3337 bytes)
Dean Taylor, the site manager from Bovis Lelliott Office clearance Site safety and method statements
equip.jpg (3387 bytes) ladder.jpg (3294 bytes)    dean.jpg (3678 bytes)

Access equipment

Cleared office area

Installation of temporary fire alarm and safety guidelines
mark.jpg (3047 bytes) demo1.jpg (3503 bytes) demo2.jpg (3819 bytes)
Marked areas for demolition Demolition in progress (1) Demolition in progress (2)
Weeks 3-4,  July - Demolition and Construction
dean.jpg (3835 bytes) phd.jpg (3269 bytes) 308.jpg (2499 bytes)
Construction planning Spaces for PhD students Partition in Rm 308 to allow for modification to its entrance
main.jpg (3511 bytes) me.jpg (4189 bytes) lift1.jpg (3550 bytes)

Cleared main lab area

Get ready for M&E Installation

Drilling for diamond cutting of the lift shaft

lift2.jpg (2907 bytes)

Structural support for removing the lift shaft

   

August - Structural and M&E Installation

   me.jpg (4508 bytes) cor.jpg (4299 bytes) lift.jpg (3304 bytes)
The main lab area M&E installation PhD area with lift shaft removed
phd.jpg (3353 bytes) 308.jpg (3115 bytes) snd.jpg (2641 bytes)
Entrance to PhD area Repartitioned corridor to create a new staff office Sound proofing between MIC lab and lecture theatres
me.jpg (3712 bytes) ac.jpg (3920 bytes) net.jpg (4018 bytes)
Power and data cabling Suspend ceiling with lighting and Aircon Units Cat 5 cables running to the control room
cable.jpg (4324 bytes) deco1.jpg (3305 bytes) deco2.jpg (4360 bytes)
Cat 5 cables servicing the lab The main lab area is now taking shape and ready for decorating Painters preparing the walls for spray painting
  
September - Decoration,   Installation & Testing
me.jpg (4726 bytes) phd.jpg (3200 bytes) conf.jpg (2619 bytes)
Main lab ready for spray painting PhD area Meeting area and entrance
cable.jpg (3559 bytes) ceiling.jpg (3195 bytes) door.jpg (3007 bytes)
Cables in the control room waiting for connection Fitting ceiling lights in the main lab area Fitting security locks on external doors
lights.jpg (2629 bytes) painter.jpg (3131 bytes) dean.jpg (2863 bytes)
Finished ceiling lights A change of plan for the lighting arrangement in the PhD area, more painting ! The manager is now on the job !
peter.jpg (2615 bytes) blinds.jpg (3841 bytes) caprice.jpg (3329 bytes)
Peter is working hard to get all the ports connected Ready to fit the blinds on to the large windows Electricians from Caprice, quite pround of the job they have done.
eddie.jpg (2244 bytes) m&e.jpg (3073 bytes) inspection.jpg (4291 bytes)
Eddie testing the spot lights M&E Inspection Building Inspection
blinds.jpg (3823 bytes) duncan.jpg (3522 bytes) pinspect.jpg (3471 bytes)
Fiting the blinds in the main lab Duncan helping fitting the blinds Geoff and Bovis inspecting the paint finish of the project
peter&bob.jpg (4105 bytes) kitchen.jpg (2224 bytes) phd.jpg (2807 bytes)
Peter and Bob wiring up the Gigbit hub Kitchen for PhD students View of the PhD lab
main.jpg (3004 bytes) main2.jpg (3914 bytes) main3.jpg (4061 bytes)
The main lab
main4.jpg (2657 bytes) main6.jpg (2667 bytes) phd.jpg (2643 bytes)
Entrance Conference area PhD student area