Pictorial
Diary
|
Weeks 1-2,
July - Contractor Mobilisation and On Site |
|
 |
 |
 |
Dean Taylor, the site manager from Bovis Lelliott |
Office clearance |
Site safety and method statements |
 |
 |
 |
Access equipment |
Cleared office area |
Installation of temporary fire alarm and safety guidelines |
 |
 |
 |
Marked areas for demolition |
Demolition in progress (1) |
Demolition in progress (2) |
|
|
|
Weeks 3-4, July - Demolition and
Construction |
|
 |
 |
 |
Construction planning |
Spaces for PhD students |
Partition in Rm 308 to allow for modification to its
entrance |
 |
 |
 |
Cleared main lab area |
Get ready for M&E Installation |
Drilling for diamond cutting of the lift shaft |
 |
|
|
Structural support for removing the lift
shaft |
|
|
|
|
|
August - Structural
and M&E Installation |
 |
 |
 |
The main lab area |
M&E installation |
PhD area with lift shaft removed |
 |
 |
 |
Entrance to PhD area |
Repartitioned corridor to create a new staff office |
Sound proofing between MIC lab and lecture theatres |
 |
 |
 |
Power and data cabling |
Suspend ceiling with lighting and Aircon Units |
Cat 5 cables running to the control room |
 |
 |
 |
Cat 5 cables servicing the lab |
The main lab area is now taking shape and ready for
decorating |
Painters preparing the walls for spray painting |
|
September - Decoration,
Installation & Testing |
 |
 |
 |
Main lab ready for spray painting |
PhD area |
Meeting area and entrance |
 |
 |
 |
Cables in the control room waiting for connection |
Fitting ceiling lights in the main lab area |
Fitting security locks on external doors |
 |
 |
 |
Finished ceiling lights |
A change of plan for the lighting arrangement in the PhD
area, more painting ! |
The manager is now on the job ! |
 |
 |
 |
Peter is working hard to get all the ports connected |
Ready to fit the blinds on to the large windows |
Electricians from Caprice, quite pround of the job they
have done. |
 |
 |
 |
Eddie testing the spot lights |
M&E Inspection |
Building Inspection |
 |
 |
 |
Fiting the blinds in the main lab |
Duncan helping fitting the blinds |
Geoff and Bovis inspecting the paint finish of the project |
 |
 |
 |
Peter and Bob wiring up the Gigbit hub |
Kitchen for PhD students |
View of the PhD lab |
 |
 |
 |
The main lab |
 |
 |
 |
Entrance |
Conference area |
PhD student area |
|
|
|
|
|
|
|
|