BEng | MEng | Activity |
2-10-02 11am 308 |
2-10-02 11am 308 |
Introductory Lecture |
4-10-02 4.30pm SGO |
4-10-02 4.30pm SGO |
Submission of Project Entry Form |
9-10-02 1pm |
9-10-02 1pm |
The Project List will be amended to show which students are taking each project. |
17-10-02 4pm SGO |
24-10-02 4pm SGO |
Submission of Report 1: Project Specification
This is a very important document. It contains the project 'external' specifications, i.e. what the project will accomplish. This is in a way a contract between your project supervisor (who will evaluate your work) and you. It should contain clearly stated:
|
17-10-02 4pm |
24-10-02 4pm |
Submission of CSG Resource Requirement Form |
8-11-02 1pm SGO |
22-11-02 1pm SGO |
Submission of Report-2: Project Design/Implementation
Report-2 is an in-progress report which should contain the already established internal design features of the project. By this time an early integration of the different contributions should have been attempted. Without early integration attempts it will be difficult to complete the project, prepare the presentation, finish the documentation, etc. in the remaining weeks. |
06-12-02 | 10-01-03 | Completion of project implementation/integration/testing. By this date the project should be virtually completed and working properly. Final tuning and minor modifications could occur later but these may jeopardise the integrity of the product demonstration which follow. |
N/A | 06-01-03 to 15-01-03 | MEng Only: Rehearsal of project 15 minute oral (Schedule to be added to the Project List). Note this is just a rehearsal; it will not be used to assess the project, and will not be attended by the project supervisor |
09-12-02 to 13-12-02 | 13-01-03 to 24-01-03 | 30 minute examination of the project, which should include about
15 minutes of presentation (with OHP/projector) plus
15 minutes demonstration of software working. You are free to mix the
presentation and demonstration in any manner which makes the material interesting.
Schedule on the Project List |
13-12-02 4pm SGO |
24-01-03 4pm SGO |
Submission of
Final Report
Report-1 and Report-2 are normally integrated into the first two thirds of the Final Report. In the rest of this report the final product is described, along with an evaluation of the problems and triumphs the group have experienced. In an Appendix there must be
All the material must be placed in a single binder/folder, and the code produced by the project placed on a CDROM inside the binder/folder. The CDROM should include any (non-proprietary) third party software essential to the project that is not found on the standard Linux or Windows insallations within DoC. MEng Only: A one page loose leafExecutive Summary must be included in the binder/folder |
13-12-02 | 22-01-02 | Release of any special CSG equipment being used by the project. |